Chasis rails moved out 3mm, we just used a ratchet strap to pull it back in before welding the cross brace, vertically it was fine (though I only remebered to check after welding, phew)
The shocks are the old rears from in Frog. Im not sure, hilux maybe? they are about 45mm longer compressed and I forget how much extended, logic would say 90mm.
Test Fit of the power steering box
Steering box plate on, crush tubes welded.
Pitman arm
Could not find a double single V pulley anywhere, so decided to go multi V.
Water pump on
Altenators side by side
all muti V now
and thats as far as I got

need to machine out the multi V pulley for the power steering pump.
I did finish off the body mounts and gave it a quick paint.
I dont want to put the rest together, but I wont have lathe access till tomorrow or the next day, which is stopping my build
I have a few small things to do, along with putting the body back on, but I dont want to untill I mount the pump as it will be easier. So I guess I will start on the transfer case.
So long as I get it all done by Sunday I will be happy.